From first sketch to the last bolt.
Five stages, each with a fixed fee, a written deliverable and a date. You can stop after any of them, and you always know what comes next.
01Five stagesStage 01 – 05
The five stages
We listen before we draw.
Two to four weeks of workshops, site visits and questions. We agree what the building must do, what it may cost and when it must open.
- Site visit and survey
- Written brief and budget
- Programme with milestones

Fig. 01 · Brief workshop
One idea, tested in models.
We test the idea in sketches, card models and quick 3D studies until the plan, the section and the budget agree with each other.
- Three options, one direction
- Massing models at 1:200
- First cost check

Fig. 02 · Study model, 1:100
Drawn to the last detail.
Plans, sections and details developed with the engineers at the same table, so the structure and services fit before anyone builds them.
- Coordinated BIM model
- Material samples and mock-ups
- Detailed cost plan

Fig. 03 · Detail set, Rev. C
Permits, without surprises.
We prepare and submit the planning and building applications, and meet the authorities early, so the answer is rarely a surprise.
- Pre-application meetings
- Planning drawings and reports
- Building regulations package

Fig. 04 · Permit set, sheet 14
On site until the keys.
We run the tender, choose the contractor with you and inspect the work every week until handover and beyond.
- Tender and contract
- Weekly site inspections
- Twelve-month defects period

Fig. 05 · Frame, week 22
02DrawingsSheet 01 of 05
Drawn to be built.
A few sheets from a typical set: sections, plans and the details that hold them together. Every one checked by the partner who signs it.

Section A–A, 1:200

Plan, ground floor

Roof structure, axonometric

Detail, wall build-up

Elevation, street
03DeliverablesTypical house
What you get, and when.
Durations for a typical 300 m² house. Larger buildings take longer; the stages stay the same.
| Stage | You receive | Weeks | Meetings | Share of fee |
|---|---|---|---|---|
| 01 Brief | Written brief, budget, programme | 2–4 | 3 | 5% |
| 02 Concept | Three options, one model, cost check | 6–8 | 4 | 15% |
| 03 Design | Coordinated drawings and cost plan | 10–14 | 6 | 30% |
| 04 Permit | Planning and building applications | 8–16 | 2 | 15% |
| 05 Build | Tender, inspections, handover | 40–60 | Weekly | 35% |
04Start55.7° N · 12.6° E
Start with stage one
A partner replies within two working days.